The Stuttgart Main Station

A masterpiece of architecture
Deutsch English Français
 
Virtual tour » History Intern. Appeal Literature & Links
 
 

The Outlook

As part of the plans for »Stuttgart 21«, the following parts of the building are scheduled for demolition. Click on the photos to see these parts, marked yellow.
 

 

Half the façade of the listed station is threatened by demolition (shown in yellow)
 

 

Half the façade of the listed station is threatened by demolition (shown in yellow)
Half the façade of the listed station is threatened by demolition (shown in yellow)
 

 

Demolition (here in yellow) of the stair in the Large Ticket-Hall
Demolition (here in yellow) of the stair in the Large Ticket-Hall
 

 

Gleishalle eines modernisierten Kopfbahnhofs
Platform hall of the modernised terminus station: a filigree flat barrel-vault spans all 16 tracks and creates a friendly atmosphere
(Concept by Roland Ostertag / proeleven)

 

» top of page

 

 

» The Beginnings

» Architectural Contest

» The Architects Bonatz & Scholer

» Development of the Design and Construction

» Description of the building and its urban integration

» Destruction in World War II and Reconstruction

» Changes after Reconstruction

» Categorisation in building history

» The Outlook

 
 

« back

 

 

   
 
Posttrakt Nordausgang Kleine Schalterhalle Mittelausgang Große Schalterhalle Turm Kopfbahnsteighalle Schlossgartenflügel Säulengang